Ready and Underway: The Owner’s Case for Commissioning

By Michael Plottel, AIAThe complexity of modern buildings often leaves owners figuratively at sea. “Did we really get everything we paid for?” and “How do we operate this thing?” are two questions that often linger long after the ribbon cutting. The answers “Yes, we did” and “Yes, we can” start...

Ready and underway The owner's case for commissioning.pdf


Library Entry
Beware of substitutions dressed in RFI or submittal clothing

By Bill Schmalz, FAIA, and Yu-Ngok Lo, AIA Most architects know that a substitution, an RFI, and a submittal are distinct things, each with its own relationship to the owner-contractor agreement. Neither RFIs nor submittals should be used to change the design intent. Substitutions can, when...

Beware of substitutions dressed in RFI or submittal clothing_2017 edits.pdf


Library Entry
Does it Really Matter? What Does the Project Delivery System Bring to the Success or Failure of the Project?

This whitepaper was authored by Jeffrey Appelbaum and presented at the 2012 American Bar Association's Forum on the Construction Industry.In just over 20 pages, this article provides a very useful summary of the key factors that characterize the most common project delivery methods. Appelbaum's...

ABA_Project Delivery Paper 2012-04-26.pdf