This will be a panel discussion utilizing case studies of both GC/CM (Washington State version of CM at Risk) and Design-Build correctional projects of the Washington State Department of Corrections. It will highlight the experiences and lessons learned from utilizing these alternative delivery methods The panel will include the Owners, Builders, and Architect involved in the different delivery methods. Best practices for each delivery method will also be shared.#Conferences #CorrectionsandDetentionsTrack #2013AAJConference #AcademyonArchitectureforJustice #Transcription #Presentations