D-Bridge

04-28-2015 10:44

2015 TAP Innovation Awards Program
Category: Exemplary use in a Small Firm Award Recipient
D-Bridge
Point B Design

Jury Comments:
What a unique project! Its strength lies in the connection between design software and fabrication and then construction. It is evident the team has labored hard to integrate software and change practices to incorporate structural analysis and fabrication knowledge into the design process. There is a clear connection between the design decisions executed and constructability with the bridge between home and gallery high tech/low tech stainless steel pre-fab honeycomb pieces. The IPD type of collaboration exhibits efficiency and control of fabrication. Very nice construction sequencing and equally nice use of BIM workflows.

Statistics
0 Favorited
54 Views
1 Files
0 Shares
352 Downloads
Attachment(s)
pdf file
D-Bridge.pdf   6.65MB   1 version
Uploaded - 04-28-2015

Tags and Keywords

  • 2015 TAP Innovation Awards
  • Case Studies

Related Entries and Links

No Related Resource entered.