I am an architect working for a Design/Build General Contractor. We are faced with the age-old dilemma of distributing construction documents to subcontractors and then later redistributing pages to reflect changes and updates...but subs continue using old drawings, because their notes are there.
As a Design-Builder we add the twist that subs often begin pricing with preliminary drawings.
How do you make sure the drawings used in the field are the most up to date version?
------------------------------
Timothy Wall AIA
Director of Design Services
Nuway Construction
Goshen IN
------------------------------