Project Delivery

 View Only

Teamwork on construction site

Quick Links

Who we are

The AIA Project Delivery Knowledge Community (PD) promotes the architect’s leadership role in all project delivery methods by assembling and distributing knowledge and best practices for a variety of project delivery methods, e.g. design-build (DB), integrated project deliveries (IPD), and public-private partnerships (P3).
  

2023 Events

- PD Symposium 2023 - now available on-demand!
PD Forum at A'23 - plus other A'23 sessions on PD

Maximizing Success in Integrated Projects – An Owner’s Guide 

10-22-2015 05:14 PM

This Guide is the result of a multi-year research project that looked at factors that enhanced team integration, which in turn lead to improved project performance on integrated projects. The research was a follow-up to the seminal 1997-1998 Penn State/Construction Industry Institute, which indicated that Design Build outperforms CM at Risk or Design Bid Build. The Guide is intended to assist owners in developing the right project delivery strategy to maximize integration and improve project outcomes. The research discovered that there is a blurring between project delivery methods, but that projects with a singular contract (Design Build or IPD) typically outperform projects with multiple, split contracts such as hard bid or CM at Risk.

#ProjectDeliveryKnowledgeCommunity #strategy #integration #projectdelivery

Statistics
0 Favorited
35 Views
2 Files
0 Shares
297 Downloads
Attachment(s)
pdf file
maximizing_success_owners_guide_v0 9.pdf   714 KB   1 version
Uploaded - 09-14-2016
pdf file
Guide Summary.pdf   442 KB   1 version
Uploaded - 10-22-2015